Port & Others
Port bulk-handling pipe and chute
Equipment: bulk unloading pipes and chutes
14 months
Service life before
38 months
Service life after
+171%
Improvement
0.3 / yr
Unplanned shutdowns
The Challenge
The bulk unloading pipes and chutes was wearing through after only 14 months of service, forcing repeated unplanned shutdowns and high spare-part consumption.
Our Solution
We rebuilt the original profile with Custom Wear-Resistant Components, then re-zoned the wear face to match the measured abrasion pattern and verified hardness across every batch.
The Result
Service life reached 38 months — a +171% improvement — while unplanned shutdowns fell to 0.3 per year and wear cost per tonne dropped accordingly.