Port bulk-handling pipe and chute
Port & Others

Port bulk-handling pipe and chute

Equipment: bulk unloading pipes and chutes

14 months Service life before
38 months Service life after
+171% Improvement
0.3 / yr Unplanned shutdowns

The Challenge

The bulk unloading pipes and chutes was wearing through after only 14 months of service, forcing repeated unplanned shutdowns and high spare-part consumption.

Our Solution

We rebuilt the original profile with Custom Wear-Resistant Components, then re-zoned the wear face to match the measured abrasion pattern and verified hardness across every batch.

The Result

Service life reached 38 months — a +171% improvement — while unplanned shutdowns fell to 0.3 per year and wear cost per tonne dropped accordingly.